Upgrading, construction and tie-in of substations, Montenegro

Upgrading, construction and tie-in of substations, Montenegro

For upgrading the Ribarevine 400 kV Substation to a 400/110/35 kV substation, and for the construction of the new Podgorica 5 110/10 kV Substation with tie-in to Podgorica 2 and 3 Substations Fichtner provides technical support for planning and tendering as well as site supervision and commissioning including their connection via cable and HV transmission lines.

Our services

  • Conceptual design
  • Drawing up the tender documents
  • Assistance in tender procedure, evaluation and contract award
  • Site Supervision with design review and approval
  • Assistance in commissioning

Technical data

  • 400/110/35 kV substation
  • 110/10 kV substation
  • Connection via 110 kV overhead line and 110 kV cable line

Client

Elektroprivreda Crne Gore A.D., Niksic, Montenegro