Least cost power development plan, Liberia
The project aim is to develop the contents and propose a time sequence for financially, politically and socially viable implementation of a ‘Least Cost Power Development Plan’ to ensure sustainable development of the Liberian power sector over a 20 year planning period. The contents elaborated are based on and fully consistent with the macroeconomic, energy and environmental policies set by the Liberian Government, and represent the optimum solutions from the country’s perspective.
Our services
- Assessment of present national power sector situation
- Assessment of national natural energy resources
- Power demand forecast
- Power generation projects for supply to the national grid
- Methodology for least cost generation planning
- Definition of target network projects and optimization of the future transmission system
- Summary of Liberian 20 year Least Cost Power Development Plan