Owner’s Engineer for Bogdanci Wind Farm, Macedonia

Owner’s Engineer for Bogdanci Wind Farm, Macedonia

Macedonia’s first wind farm is being erected near the town of Bogdanci. It comprises 16 turbines together with control systems and cabling as well as infrastructure, like access roads, grid connection, substations and transmission lines. Fichtner acts as Owner’s Engineer in the planning and tendering phases as well as during construction and commissioning. Fichtner also successfully handled validation for registration of the project under the clean development mechanism (CDM) of the Kyoto Protocol.

Our services

  • Conceptual design with cost estimate
  • Validation of CDM potential for registration under the Kyoto Protocol
  • Tendering, bid evaluation and assistance in contract negotiations
  • Project management
  • Overseeing construction and commissioning
  • Quality assurance and HSE monitoring
  • On-call services during the three year defect notification period

Technical data

  • Wind turbines: 16 x 2.3 MW for 36.8 MW installed capacity
  • Electricity generation: 100 GWh/a
  • Grid connection: 110 kV

Client

AD ELEM-JSC Macedonian Power Plants, Skopje, Macedonia