Geotechnical investigations for construction of a sewer culvert, Germany
The Hamburg City Sanitation Department is planning to construct a new sewer culvert under the U1 subway route in the vicinity of the main road Rothenbaumchaussee. For this purpose, our geotechnical engineers undertook geotechnical investigations, including a wide-ranging lab analysis program. On this basis, within the context of a geotechnical assessment opinion, Fichtner worked out recommendations for construction. We paid particular attention to planning this demanding project and controlling the settling behavior around the existing subway line.
Our services
- Assessment of geotechnical conditions and consultancy on foundations
- Soil-mechanical trials
- Assessment of settling behavior
Technical data
- Length of sewer section: 30 m
- Sewer pipe cross-section: DN 2000
- Depth of bottom of sewer pipe: 3.8 m below sea level
- Grade level: 8.9 m
- Crossing below subway tunnel, old sewer