Selected project examples

PV energy yield assessment, Australia

PV energy yield assessment, Australia

The scope of services for this assignment included a yield assessment (high-level) of a 25 MW AC reference plant. The yield assessment included uncertainty and probability-based forecasts for the expected power production on an annual basis in kWh/kWp (including P50, P75, P90 and P99 estimates) for a long-term period of 20 years. In addition to this solar-only option, Fichtner considered two solar-plus-battery options. For all three scenarios, Fichtner presented CAPEX and OPEX ranges.

Services

  • Yield assessment
  • CAPEX and OPEX estimations

Technical data

  • 25 MW AC

Client

Glencia Power Pyt. Ltd., Perth, WA, Australia